Assembly Stages

Assembly work

1. Preparation of trolley for unloading. 2. Unloading using a crane.

3. Ballasting. 4. Mounting of load bearing on the boom.

5. Preparation of the work platform frame. 6. Work platform frame prepared for installation of floor planks.

7. Installation of work platform handrails. 8. Set-up of the assembly trolley.

9. Securing the brake. 10. Protecting the arm with rods.

11. Protocol of transfer of the trolley to the user.

12. Trolley with retracted arm (offering the ability to negotiate hindrances such as pillars, lamp posts, etc.).